SUMMARY
Ⅰ. Experienced mechanical
design for 25 years.
Developed representative machine and parts below.
1)10MPa Waterproof (100m Water Depth) Case,
Mic and Speaker for
Cellular Phone.
2) Racing Engine Cylinder Block and New Intake System
for Formula1.
3) Aircraft Structure Design for BOEING Commercial Air Plane.
Ⅱ. Staff
management.
1. Experienced 10 staff management.
2. Achieved maintaining a
high member operating rate with adjust the amount of work that changes from time
to time with the client side.
3. Achieved a high output
quality and speed by promoted standardization to enhance the operator's skill.
4. Achieved a high reputation
in HONDA and Nissan Light Truck.
Ⅲ. Work
experience with overseas
1.
Experienced working in the same
team as the business trip employees five of Boeing at Fuji Heavy Industries.
2.
Experienced the TV conference
of the each location, United States and Spain at Nissan Lite Truck.
Ⅳ. Strong point.
1.
Waterproof seal technology for
Cellular Phone.(Published Patent 12)
[Compact sealing technology with 100m depth waterproof]
2.
Waterproof microphone &
speaker technology for Cellular Phone.
(Published Patent 5)
[Maintain performance after 100m depth water pressure]
3.
Waterproof connector technology
for Cellular Phone.(Published Patent 6)
[Anytime able to connect and disconnect, even state wet with a water]
*1,2,3 is innovation of waterproof technology that becomes the
world's first when it is realized.
4.
Intake technology for
automobile.(Static & Dynamic reaction understanding)
5. Tolerance analysis that is important elements of the
qualityand cost understanding.
PROFESSIONAL EXPERIENCE (from recent)
Apl.2011
– Present
Technopro design
[Number
of Employees] 5800
[Amount
of Sales] 385 hundred million yen
[Business]
Dispatch industry
Jun.2013
- Present
Dispatched HONDA Automobile R&D Center
Powertrain Development Department
Developed
the engine electrical harness and around fuel supply parts
with led the 7
members.
<
Element technology>
Component
layout of negotiating with foreign department, Strength analysis,
Tolerance
analysis,Cost
calculation, Mechanical drawing, Bounties created, Technical negotiations with
manufacturers,Design
review corresponds, Factory request handling, Creating mass production approval
document,Creating
for business standardization manual.
<
Major Accomplishments>
* Achieved
the early launch by establish appropriate organization and business flow.
* Achieved performance
comparable to customer output by establishing flow with a temporary staff
configuration.
* Achieved
a expand business content and increase personnel number
5 to 8.
* Achieved
a technique for quickly noise analysis to improve the specifications
considered
speed.
* Achieved
a responsible model expansion in.
Apl.2011
- May.2013
Dispatched NISSAN Motor Light Truck Powertrain
Development Department
Developed
the engine around bracket, piping and hose parts with led the 10 members.
<
Element technology>
Component
layout of negotiating with foreign department, Strength analysis, Tolerance
analysis,Cost
calculation, Mechanical drawing, Bounties created, Technical negotiations with
manufacturers,Design
review corresponds, Factory request handling, Creating mass production approval
document,Business
cooperation with overseas bases (the United States, Spain and Thailand)
<
Major Accomplishments>
* Achieved
a success in the establishment of new business contract.
* Six
months after the expansion to 11 staff members
from 4 staff at the start.
* Solved
the serious acoustic problems that occurred in the intake system
in simulation and one trial.
* Achieved
release of drawing delay zero during the contract period.
Oct.2005
- Sep.2008
UNI-TECHNOS
[Number
of Employees] 13
[Amount
of Sales] 1 hundred million yen
[Business]
Dispatch industry
Dispatched Casio Hitachi Mobile Communications
Mechanism Designing Division
<
Element technology>
Housing
integrated packing, Waterproof connector, Developed around the water pressure
resistance speaker and microphone, Development policy decision, Basic
experimental plan,
Experimental
equipment preparation, Cooperation manufacturer survey and negotiations,
Concept
design, Waterproof casing evaluation method planning, Experiment, Measurement,
Result
Summary Report, Patent application
<
Major Accomplishments>
* Achieved
the waterproof performance of 50 times (2m to 100m)
a present cellular phone in
the element technology.
* Achieved the prototype
100m depth waterproof connector that is anytime able to connect and disconnect,
even state wet with a water.
* Developed
the case to keep a waterproof performance even if case
does transformation by
the 2m dropping impact.
* Achieved biggest
result that is developed hydraulic pressure proof acoustic structure without spoiling
the acoustical performance.
* Registered
patent numbers. [ Domestic : 23 -Global :
1 ]
* Achieved
the dispatch destination house top in the number of patent applications at 2008
first half.
Apl.2004
- Sep.2005
VSN
[Number
of Employees] 2800
[Amount
of Sales] 176 hundred million yen
[Business]
Dispatch industry
Dispatched RICOH Mechanism Designing Division
Development
and design of the printer fixing unit
<
Element technology>
Mass
production confirmation test, Data Summary, Problem analysis, Countermeasures
planning
<
Major Accomplishments>
* Developed
feedback control to stabilize Establish Unit for printer system.
* Achieved
the reduce 70% of problem by feedback control.
Oct.2001
- Mar.2004
BUN-TECHNO
[Number
of Employees] 1000
[Amount
of Sales] 20 hundred million yen
[Business]
Dispatch industry
Dispatched TOYOTA MOTOR Formula1 Racing Engine Development
Division
F1
engine development design
Cylinder
block main representative in Japan development bases, Intake port development
vice
<
Element technology>
Strength
analysis, Fluid analysis, Engine performance simulation, Tolerance calculation
Mechanical
drawing, Bounties created, Technical negotiations with manufacturers, Parts
layout,Cylinder
block design of the experimental single-cylinder engine, Intake port design,
Cylinder
block design of the actual run engine, New piston cooling system design,
Cylinder
interference analysis of the intake pulsation using acoustic
<
Major Accomplishments>
* Achieved
delay less development schedule with designed Single-cylinder engine
* Achieved greatly
improve the durability with an ideal piston cooling structure applied in the F1
engine with less space.
* Developed
the New Intake System using the effect of the inertia supercharging
* Achieved
New Intake System obtained the analytical result that suction volume efficiency
was greatly improved. This result is high evaluation from Germany race
team
* Achieved
great result in actual race by developed piston cooling system.
Dec.1995
- May.2001
ALPS-GIKEN
[Number
of Employees] 2800
[Amount
of Sales] 23 hundred million yen
[Business]
Dispatch industry
Feb.2000
- May.2001
Dispatched HONDA Automobile R&D Center Production
Technology Department
Race
engine production technology design
<
Element technology>
Engine
development jig-tool design, Equipment design, Intake port development for racing
engine
<
Major Accomplishments>
* Awarded
the temporary staff's first improvement proposal award
at the jig design of race engine.
* Participated
in the intake port for F1 development at the suggestion of the design.
* Achieved
a good result in the test designed intake port.
May.1998
- Jan.2000
Dispatched Fuji-Heavy-Industries Aircraft Structure
Designing Division
<
Element technology>
Airframe
parts detail 3D modeling of B767-400ER, Mechanical drawing, Creating parts list
<
Major Accomplishments>
* acquired
complex material structure and the aircraft design standard.
* acquired
English in practice and Boeing headquarters employees
Dec.1995
- Apl.1998
Dispatched OKI Electric Mechanism Designing
Division
<
Element technology>
Concept
design of automatic exchange (MDF), Detail design, Prototype assembly, Strength
test
<
Major Accomplishments>
* Realized took
over the development theme of automatic exchanger structure that customer
representative was impossible.
* Achieved in
making the cost review the basic structure of the housing and about
a third of
1 (22 → 7 million yen).
* Achieved 77%
cost cut for the case.
* The currently series of in the number of terminals
as main models sold to the world.
Apl.1994
- Apl.1995
MEITEC
[Number
of Employees] 6800
[Amount
of Sales] 168 hundred million yen
[Business]
Dispatch industry
Dispatched TOKYO KOKU KEIKI Precision Machine
Engineering Division
Aircraft
oxygen generator developed members
<
Element technology>
Support
fighter F-2 for compressed oxygen compressors for concept design, Detail design,
Mechanical
drawing, Parts measurement, Performance test
<
Major Accomplishments>
* Achieved volume
ratio 40% decreased the size of the customer's prototype model that is a reciprocating
compressors for compressed oxygen.
*
Equipped to support fighter F-2.
Apl.1989
- Mar.1990
HONDA MOTOR
[Number
of Employees] 23000
[Stated
capital] 860 hundred million yen
[Business]
Automotive manufacturing industry
<
Period employee>
Body
assembly Division
< Element
technology>
Rear
pillars and the seat belt assembly of the Accord, The assembly roof trim
Prelude
Apl.1987
- Mar.1989
KEIHIN
[Number
of Employees] 22000
[Stated
capital] 69 hundred million yen
[Business]
Automotive parts manufacturing industry
Mechanism
Designing Division
Dispatched
to the Honda Technical Research Institute to learn the development techniques.
<
Element technology>
Jig
design for development, Mechanical drawing, Tolerance calculation,
Parts dimension measurement, Development test data
measured
and summarized
Experienced using CAD and analysis system software.
l CATIA V5 & CAT Analysis
l Pro-E WF2 & Mechanica
l GT-POWER
Patent acquired patent rights in individual
Waterproof microphone for portable electronic
equipment [Jan.2010]
長いな^^;
0 件のコメント:
コメントを投稿